Case Histories
Case History 2
In the example below, a machine-ready blank eliminated .98 minutes of time spent premachining a rough blank, including the handling and reclamping of parts. Machine-ready blanks cut over 16 hours off the throughput time of the job and saved $0.57 per part. This was achieved even after realizing a 100% increase in the material cost. Not only was this customer able to save about $570 but they were able to ship more product out the door with the 17 hours of throughput they gained.
Rough-BlankMaterial: 5/16 X 1 1/8 X 1 1/8 (Oversize) |
Machine-Ready BlankMaterial: .250 X 1.000 X 1.000 |
Results
Machining cost savings: $1.23 / part
Material increase: $0.66 / part
Total cost savings: $0.57 / part
Total job savings: $570
Throughput increased: ≈0.98 minutes/part or 16.33 hours of machine time freed up for more jobs